Eau Claire, WI · Northwestern Wisconsin Closed now (715) 450-9897

Concrete in Chippewa Falls

Concrete in Chippewa Falls, Wisconsin.

Concrete flatwork, aprons and curb in Chippewa Falls. Commercial pours go down at 4,500 PSI with tied rebar, priced and scheduled with the asphalt.

4.7 from 18 Google reviews

About 15 minutes from Eau Claire. Free estimates, and a straight read on whether it needs doing yet.

A poured concrete apron running from a parking lot up to a loading dock door on a metal industrial building, with the asphalt tied in along its edge.
15,075 People in Chippewa Falls
4.7 Google ratingFrom 18 reviews
2-3 yrs Reseal cycleIn Chippewa Falls
400°F Crack fillerDirect-fire rubber

What a Concrete Job Looks Like in Chippewa Falls

Old housing means old driveways, and old driveways in this valley were often laid thin over a base that was never really built. That's the honest problem in Chippewa Falls: more of the surfaces we look at here are genuinely past sealing than anywhere else we work, and telling somebody that costs us the easy job.

The commercial side is the opposite story. The industrial parks on the east side and out toward Lake Wissota are newer, larger and truck-heavy, with the kind of lots where catch basins and dock aprons carry real weight and fail on a schedule.

Concrete specifically in Chippewa Falls

Old town, old sidewalks and old aprons. Most of the residential concrete we replace here is a garage apron that has settled where it meets an asphalt drive. That joint is exactly where two trades met at a line and neither owned it, which is why it's usually the first thing to fail and the last thing anybody budgets for. On the West Hill grades it fails faster, because water coming off the drive concentrates at exactly that seam.

The Driveways and Lots in Chippewa Falls

Chippewa Falls sits on the north bank of the Chippewa River with Duncan Creek running through the middle of it and Lake Wissota about three miles east. The West Hill rises on a bluff west of downtown, so the town has real grade: the hill and the river flats drain completely differently, and pavement on each behaves accordingly.

Chippewa Falls has the oldest housing stock we work in. Thirty-one percent of the city's houses were built before 1940, which is nearly double Eau Claire's share and eight times Lake Hallie's. Only about 16 percent has gone up since 2000.

The West Hill historic district is the clearest example: 163 contributing properties across 66 acres, running from 1870s lumber-baron mansions to 1950s ranch houses, sometimes on the same block. What that means practically is narrow drives, steep approaches, tight turns beside a house, and a lot of hand work. It's not a spray-and-go town.

Where we work in Chippewa Falls

  • West Hill
  • Downtown and Bridge Street
  • East Hill
  • Riverside
  • Lake Wissota

Around Chippewa Falls: Leinenkugel's Brewery, Irvine Park, Northern Wisconsin State Fairgrounds, Heyde Center for the Arts, Lake Wissota.

Same freeze regime as the rest of the valley, with footings required at 48 inches minimum. The difference here is the bluff: water coming off West Hill has somewhere to go and takes the long way, so drives at the bottom of a grade see far more of it than the ones at the top.

From our jobs

Job Photos

A fresh asphalt drive lane running up to a loading dock door at an industrial building, new yellow lines beside it
The approach paved up to the dock
A freshly poured concrete walk across the front of a commercial building, coned off, with the bollards set
A storefront walk poured and coned off
Two crew working a curb and gutter pour, radius forms and rebar in place
Curb and gutter: radius forms and rebar, on a Best Buy storefront
A freshly poured concrete walk running past steel bollards at a commercial storefront, coned off
A storefront walk poured around the bollards
A new concrete driveway running to a single garage at a blue house, caution tape across the street end
A driveway replaced, start to finish
A new concrete driveway poured down the side of a house, crossing the public sidewalk, cones at the street end
A driveway poured down the side of the house

All job photos

The joint between concrete and asphalt

Concrete and asphalt move differently. Concrete is rigid and moves at its joints; asphalt is flexible and moves everywhere. Where they meet, that difference has to be absorbed, and if it's not, the joint opens. Once it's open, water goes straight into the base under both of them. This is why so many lots fail first at the dock apron, the dumpster pad and the garage apron. Not because those slabs were bad, but because two different the line where they met was nobody's. We pour the concrete and lay the asphalt against it, so that joint belongs to the job.

What Decides the Price in Chippewa Falls

Flatwork prices per square foot and is easy to quote from measurements. Structural work like curb or a dock apron is quoted per project, because the forming is most of the labor and it doesn't scale with area.

Garage or dock apron

Per project

Measured on site

  • Thicker slab, tied rebar, asphalt tied back in

Dumpster pad

Per pad

Measured on site

  • Heavy slab, because a loaded truck on a hot day is the worst case
  • Sized to the truck, not to the dumpster

Curb and gutter

Per linear foot

Measured on site

  • Straight run at the low end, radius work at the high end

What moves it: thickness, reinforcement, how much has to come out first, access for a truck, and whether the asphalt around it needs tying back in. Removal and haulaway is a real line and gets quoted rather than buried.

How the Work Goes in Chippewa Falls

Base, forms, steel, pour, finish, and the asphalt keyed back in against it.

Take out what's there

Broken slab out and hauled away, down to whatever the new pour needs to sit on.

Prepare and compact the base

Graded and compacted. Concrete poured on soft ground cracks on a schedule set by the ground, not by the concrete.

Form and reinforce

Formed to grade so water runs where it should, and reinforced where the span and the loading call for it. Radius forms for curb work.

Pour and finish

Placed, screeded, floated and broom finished. Control joints cut where the slab is going to crack, so that it cracks there instead of somewhere visible.

Tie the asphalt back in

The step most concrete contractors leave to somebody else. Asphalt keyed to the new edge, compacted, joint sealed.

Questions We Get in Chippewa Falls

What Chippewa Falls calls us about, answered straight.

More questions answered
Our house is in the West Hill historic district. Are there rules about the driveway?
Resurfacing or sealing an existing drive is maintenance rather than a visible alteration, and it isn't the kind of thing that normally raises a question. Changing the shape of a drive, its material or its width is a different matter, and the city is the right place to ask before anyone quotes it. The estimate says which side of that line your job is on.
Why does everything cost more per square foot on a small old driveway?
Because it isn't the square footage that costs, it's the edges and the access. A pre-war drive on the West Hill bluff is narrow, often steep, and frequently runs right up against a foundation or a retaining wall, so both sides get cut in by hand rather than sprayed. A wide modern drive with grass on either side takes a fraction of the time for twice the area. We price that in rather than discovering it on the day.
How much does a concrete driveway cost?
Thickness, reinforcement and access are what move it. A slab that has to carry vehicles is thicker than one that carries feet, steel adds cost and adds life, and a pour a truck cannot reach has to be barrowed, which is labour. Removing the old surface is quoted separately rather than hidden in the rate, so you can see what each part costs.
Concrete or asphalt for a driveway?
Concrete costs roughly two to three times as much up front and lasts longer with less maintenance. Asphalt is cheaper, goes down faster, handles frost movement better, and needs sealing every two to three years. Which one suits comes down to the loading, the frost and the budget.
Do you do curb and gutter?
Yes, including radius work, formed and poured to spec. It is priced by the linear foot, and a curve costs more than a straight run because the forms have to be built to the radius.
Why do dumpster pads fail so often?
Because they're usually sized to the dumpster instead of to the truck. The worst loading a pad ever sees is the front axle of a loaded refuse truck on a hot day, and a slab poured for the container alone isn't built for that.
How long before we can use new concrete?
It depends on the mix, and that is worth asking about rather than assuming. On a standard pour: foot traffic in 24 to 48 hours, vehicles after about seven days, heavy trucks at 28 days for a full-strength cure. Where the schedule will not take seven days, we spec a 4,500 PSI exterior mix instead. One of those is a loading dock apron we poured with tied rebar in a working parking lot: customers were driving on it three days later. Whichever mix your job gets, the window goes in the scope up front so you can plan around it before the pour.
Do you subcontract the concrete out?
The concrete and the asphalt around it are priced and sequenced together, so the joint between them is somebody's responsibility rather than nobody's.

Get a Free Estimate in Chippewa Falls

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on driveways and lots anywhere in the service area
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.