Asphalt Paving in Durand
Asphalt Paving in Durand, Wisconsin.
Asphalt driveways, overlays and small lot paving in Durand.
About 40 minutes southwest of Eau Claire. Free estimates, and a straight read on whether it needs doing yet.

What an Asphalt Paving Job Looks Like in Durand
The commercial base here's county and civic rather than retail: courthouse, county offices, a hospital, schools, and the businesses that serve them. Those are steady lots with predictable use and real accessible-parking obligations, which is a different profile from a highway strip.
Durand is also the furthest point southwest we cover, so we batch work here rather than running single small jobs out and back. If you have neighbors thinking about it, say so when you call. Several drives on one trip is genuinely cheaper to deliver, and that shows up in the number.
Asphalt Paving specifically in Durand
Full replacement comes up more in Durand than anywhere else on the list, for an honest reason: some of these drives are seventy years old over a base that was never engineered. When that's the case, an overlay follows the same failing shape.
The Driveways and Lots in Durand
Durand is the Pepin County seat, on the Chippewa River near where it runs down toward the Mississippi, and the southwest corner of what we cover. County seat is the operative fact: it carries a courthouse, county offices and a hospital for a population of 1,854.
Durand has the oldest housing stock of any town we work in. Fifty-six percent of it predates 1960 and roughly a quarter predates 1940. Fewer than fifty units in the entire city have been built since the year 2000, and only a handful went up in the whole of the 2010s.
That changes what an honest quote looks like here. A drive that's been in the ground since the fifties, over a base that predates any modern specification, is not automatically a sealing job. Sometimes it's. Sometimes the truthful answer is that sealer over a failed base is money spent on appearance, and we would rather tell you that than take it.
Durand
We work the whole village rather than a named handful of neighborhoods.
Around Durand: Pepin County Courthouse, Chippewa River, Durand-Arkansaw schools.
Standard 48-inch frost depth. River-valley position, so cold settles overnight and the shoulder seasons have a narrower working window than the flat ground upriver.
From our jobs
Job Photos
Overlay or tear out and replace?
An overlay is new asphalt laid over the old surface. It's roughly half the cost of a replacement, it goes down in a day, and it's the right answer when the existing base is sound and the surface has simply worn out. It's the wrong answer when the base has failed, because an overlay follows the shape of what's underneath. Lay one over a surface that's cracked into squares and those cracks come through the new mat within two or three years, and the overlay only delayed the replacement. That conversation is worth having before the quote, not after.
What Decides the Price in Durand
Asphalt tracks the oil market, so a number from last season is not a number for this one. Every job here is measured on site and the number is fixed before work starts.
Overlay
Per square foot
Measured on site
- Existing base sound, surface worn out
- Overlay or full replacement, priced after the base is checked
Tear out and replace
Per square foot
Measured on site
- Old surface out, base rebuilt, new mat laid and rolled
Gravel to asphalt
Per square foot
Measured on site
- Common out in the townships, where drives are long
- Grading and drainage are most of the work and most of the cost
The setup on a long rural drive is spread over more area than on a short town one. If you've been told a long drive is prohibitive, it's worth a second number.
How the Work Goes in Durand
The base is the part you never see and the part that decides everything.
Work out where the water goes
Before anything else. Grade and drainage decide the lifespan, and they're the one thing that can't be fixed later without starting again.
Remove, or prepare what stays
Full replacement means the old surface comes out. An overlay means the existing surface is cleaned, failed areas cut out and patched, and the edges prepared.
Base, graded and compacted
Compacted in lifts to the right depth for what will drive on it. A driveway and a lot that takes delivery trucks need different bases, and building both the same way is how one of them fails early.
Lay and roll
Hot mix laid to the design thickness and rolled while it's hot. Compaction is time-limited, which is why paving is a day that runs to the weather.
Tell you when to seal it
Not this year. New asphalt needs six to twelve months to cure before its first seal, and sealing too early traps the oils and does more harm than leaving it alone.
The house is from the 1940s and so is the driveway. Where do we start?
Do you come this far out for one driveway?
Does being down in the river valley change when you can work here?
How much does a new asphalt driveway cost?
Can I overlay the driveway instead of replacing it?
When can a new driveway be sealed?
How long does a well-built driveway last?
Can you pave a gravel driveway?
When can we drive on new asphalt?
Get a Free Estimate in Durand
Tell us what it looks like and we'll come measure it. You get a written price before anything starts.
(715) 450-9897- Free on driveways and lots anywhere in the service area
- A photo of the problem helps, and it can go in the message
- Surfaces that are not ready yet get told so at the estimate
Get an estimate
Send the form and we'll call you back. The estimate is free.
Other Work We Do in Durand
- Sealcoating in Durand
- Crack Filling and Sealing in Durand
- Asphalt Repair and Patching in Durand
- Catch Basin Repair in Durand
- Parking Lot Striping in Durand
- Track and Athletic Surfaces in Durand
- Concrete in Durand
- Commercial Snow Removal in Durand
Asphalt Paving in Nearby Towns
- Asphalt Paving in Mondovi
- Asphalt Paving in Menomonie
- Asphalt Paving in Elk Mound
- Asphalt Paving in Eau Claire
- Asphalt Paving in Colfax
- Asphalt Paving in Altoona
Everything about asphalt paving, including how the work goes and what changes the price


