Commercial repair · Eau Claire and Chippewa Falls
Commercial Parking Lot Repair in Eau Claire and Chippewa Falls
Potholes, failed areas, sunken aprons and catch basins, cut back to sound material and rebuilt before the ground freezes. Asphalt and concrete, priced and scheduled together.
What Winter Does to an Open Lot
A crack, a pothole and a settled catch basin all do the same thing between November and April. They let water into the base and then freeze it there.
| What you have now | What the winter does to it | The repair |
|---|---|---|
| Open cracks you could fit a pencil in | Water runs down into the base and freezes about 90 times, prying the crack wider every cycle | Hot rubber crack filling |
| A pothole somebody filled with cold patch | The first hard freeze pulls the patch back out, and the hole is bigger than it was | Saw-cut full-depth patching |
| A catch basin grate sitting below the asphalt | A plow blade catches the frame, the collar loosens, and the ring of asphalt around it comes apart | Basin rebuilt and brought back to grade |
| A low spot that holds water after every rain | It becomes an ice sheet, and the same square foot cycles through freezing dozens of times | Drainage corrected, area rebuilt to grade |
| A cracked dumpster pad or dock apron | Water under the slab lifts it, and the asphalt tied into it fails at the joint | Concrete replaced, asphalt tied back in |
What We Fix Before the Ground Freezes
Sealcoating waits for spring, because sealer needs 50 degrees holding overnight. The work below does not.

Crack Filling
Hot rubber at 400 degrees, so it bonds to the crack walls and stays flexible when the pavement moves. This is the one with the hardest deadline, because an open crack is how the water gets in.

Asphalt Repair
Potholes, alligatored areas, sunken aprons and sinkholes. Saw-cut back to sound material, rebuilt full depth, compacted, and the perimeter joint sealed.

Catch Basin Repair
Repair, replacement and new basins poured. Excavated, rebuilt with a concrete collar, brought back to grade and tied into the asphalt so nothing catches a blade.

Concrete
Dumpster pads, loading dock aprons, curb and gutter, sidewalks and flatwork, with the asphalt that ties into them priced alongside.
What a Customer Said
“Grant and his team came and got the job done in a timely manner and kept good communication the whole time. Being a business owner this helped a lot to keep customers coming in as usual. Highly recommended.”
A business owner describing a lot that kept trading while the work got done. Timing on a working lot is the first thing to raise when we walk it, and repair work has more room in it than sealcoating does, because there is no cure window across the whole surface.
What Can Wait Until Spring
Sealers "will wear off quickly under high traffic volumes and effectively do nothing for a pavement that is failing or has failed."Wisconsin Asphalt Pavement Association, 2018 Parking Lot Design Guide
Most lots have some work with a deadline this fall and some without one. Open cracks, failed areas and a settled basin are the first kind, because winter makes each of them bigger. A gray surface, a faded stripe and a reseal are the second kind, and they cost the same in May as they do in October. When we walk your lot we tell you which is which, and what year each one is for.
The Numbers Behind the Deadline
Eau Claire pavement crosses freezing about 90 times a year, worked out from NOAA's 1991-2020 climate normals for Eau Claire Regional Airport. March is the worst month at roughly 18 crossings and November is the other bad one, which is why an open crack going into winter is not the same crack coming out of it.
Sealer is the part that runs out of season. It needs 50 degrees on the pavement and in the air, holding through the night, and only June, July and August average above 50 overnight here. Repair does not have that limit, which is why the fall list is crack filling, patching, basins and concrete. The same weather runs the lots in Eau Claire and Chippewa Falls, and the same deadline. Commercial sealcoating
Snow Plowing

A lot with the basins level and the failed areas rebuilt plows cleanly, because the blade is not catching a frame or dropping into a hole. We plow commercial lots in Eau Claire and Chippewa Falls, and we are taking new commercial accounts for this winter.
Parking lots, drive lanes and walkways. Commercial only. Ask about it when we walk the lot. Commercial snow removal
Next Year's Budget
Commercial budgets get set in the fourth quarter for spring work. A bid written now is a line in that budget.
A fall walk-through gets the work with a deadline onto the schedule and puts a number on paper for the work that can wait, early enough to be planned.
The bid breaks the lot out by area rather than pricing the whole surface, so what does not need doing this year is on the page too. That is the document a board or an owner is asking for. All commercial services
Is it too late in the year to repair a parking lot?
Why does the same pothole come back every spring?
What does a plow do to a catch basin?
How many freeze-thaw cycles does Eau Claire actually get?
Do you do the concrete as well, or just the asphalt?
Do you work in Chippewa Falls, or only Eau Claire?
Can I get a number now for work next year?
Get a Free Estimate
Call and tell us about the lot. Eau Claire, Chippewa Falls and the valley around them. The estimate is free, and the number you approve is the number you pay.
(715) 450-9897Or send the form and we'll call you back.
Get a bid
We'll call you back, walk the lot, and measure it.