Eau Claire, WI · Northwestern Wisconsin Closed now (715) 450-9897

The short answer, and the long one

What Is Pavement Maintenance?

Keeping water out of the base under your pavement, in the right order, before the surface is gone. Do it and a lot lasts decades. Skip it and you are buying a new one.

Water in the Base

Asphalt is not the structure. The compacted stone underneath it is. The blacktop is a wearing course that keeps weather off that base, and everything called pavement maintenance is one of two jobs: keep water out of the base, or repair the base once water has got in.

That is why the order matters so much and why doing the cheap thing at the wrong time is worse than doing nothing. Sealer is a coating. It will not bridge an open crack, it will not lift a sunken area, and spread over a lot whose base has already failed it buys a uniform black surface and hides the evidence for a season.

In northwestern Wisconsin the clock runs on freeze and thaw rather than on sun. A crack that takes water in October is a wider crack in April, because the water in it expanded about nine percent and levered the sides apart. That cycle runs dozens of times a winter.

The short version

  • Water in the base is the failure
  • Everything else is preventing it or repairing it
  • Order matters more than any single step
  • Freeze and thaw sets the pace here, not sun

A lot kept sealed and crack filled from new can run decades. The same lot left alone needs repaving in a fraction of that, and repaving costs many times what the maintenance would have.

The Order the Work Goes In

Each step assumes the one before it is done. Sealer over outstanding repairs covers them up for a season and changes nothing underneath.

Clean and assess

You cannot judge a surface under dirt, and nothing bonds to it either. This is also when it gets decided whether the base is sound, because every step after this assumes it is. See what we look for

Repair what has failed

Areas that flex underfoot, potholes, and anything sunken get cut out full depth and rebuilt. Coating over these is what wastes the money. Asphalt repair and patching

Fix the drainage

A sunken catch basin, a blocked drain line or a low spot that ponds will undo the repairs above it. Water is the whole problem, so anything that concentrates it gets dealt with before the surface work. Catch basin repair

Fill the cracks, hot

Anything wide enough to take water gets hot rubber that bonds to the crack walls and stays flexible through the freeze cycle. Cold pourable filler sits on top and pulls away. Crack filling and sealing

Seal the surface

Now the coating has something to do: it keeps water and oxidation out of a surface that is sound underneath. On a two to three year cycle in this part of Wisconsin. Sealcoating

Put the lines back

Sealer covers the layout. Stalls, arrows, fire lanes and ADA stalls with their access aisles go back on after it cures. Parking lot striping

Get through the winter

A blade set too low takes the sealer off, and a blade that catches a basin frame lifts it into a spring repair. Winter is part of the maintenance cycle rather than separate from it. Commercial snow removal

What It Covers on a Commercial Property

A parking lot is not only asphalt. These are the parts that fail, and every one of them is somebody's job when it does.

Most companies in this market do one or two of these. We do all of them, which is what full service pavement maintenance means. Commercial services

Questions We Get

What is the difference between pavement maintenance and paving?
Paving lays a new surface. Maintenance keeps the one you have from needing that. They are different trades in practice: a paving contractor wants the big job and is not usually interested in a small annual maintenance visit, and a sealcoating company usually cannot do the repair work that has to happen first. That gap is where lots get sealed when they should have been repaired.
How often does a parking lot need maintenance?
Sealcoating runs on a two to three year cycle in northwestern Wisconsin, and crack filling is usually annual or with the seal, because new cracks open every winter. Repairs are as needed. Striping normally goes back on with the sealer. Traffic changes all of it: a drive lane and a back row of stalls in the same lot are not on the same schedule.
Is sealcoating the same as pavement maintenance?
No, it is one step of it, and it is the last one. Sealing a lot whose base has failed or whose cracks are open is money spent on making a problem harder to see. A company that only offers sealcoating can only offer you that step, which is why the order above matters when you are choosing who does the work.
What happens if we defer it a few years?
The cost moves up the scale rather than staying still. Crack filling is the cheapest work on a lot; letting those cracks open turns them into full-depth repair, and letting the base go under them turns that into repaving. Each step you skip does not disappear, it just gets bought later at the next price.
Does it include the concrete and the drainage?
On a commercial property it has to. The catch basins, the curb, the dock aprons and the dumpster pad are where a lot actually fails first, and they are the parts a sealcoating-only contractor has to hand to somebody else. They are all on the list above.

Not Sure Where Your Lot Is in That Order?

Send a photo of the worst area. The reply names which step you are actually at, which is usually earlier than people expect and occasionally later.

(715) 450-9897