Eau Claire, WI · Northwestern Wisconsin Closed now (715) 450-9897

Asphalt Paving in Osseo

Asphalt Paving in Osseo, Wisconsin.

Asphalt driveways, overlays and small lot paving in Osseo.

4.7 from 18 Google reviews

About 25 minutes southeast of Eau Claire. Free estimates, and a straight read on whether it needs doing yet.

A freshly paved asphalt lot in deep black, running up to a white barn and silo.
1,818 People in Osseo
4.7 Google ratingFrom 18 reviews
2-3 yrs Reseal cycleIn Osseo
400°F Crack fillerDirect-fire rubber

What an Asphalt Paving Job Looks Like in Osseo

The interchange is the story. Travel-stop and fuel surface takes a kind of punishment almost nothing else does: constant heavy vehicles, tight turning circles, fuel and oil on the surface, and no quiet season to repair in. Sealer won't stick to a fuel-contaminated apron, and that has to be dealt with before anything else happens.

Away from the interchange, Tenth Street is the commercial strip and Eighth Street carries the hospital. Those are ordinary lots with ordinary wear, and they get quoted like anywhere else.

Asphalt Paving specifically in Osseo

Overlays suit the better-built 1970s drives. The interchange lots are bigger jobs, and the written estimate spells out what gets done and when.

The Driveways and Lots in Osseo

Osseo sits where the north and south forks of the Buffalo River meet, in Trempealeau County, and more importantly where three routes converge: US 10, US 53 and Interstate 94. For a village of 1,811 that produces a commercial profile far larger than the population, concentrated around the interchange.

Over 28 percent of Osseo's housing was built in the 1970s, the sharpest single-decade concentration of any town in the service area. About a third predates 1960 and fewer than eighty units have gone up since 2000.

A 1970s drive is now fifty years old. Some were built properly and have been sealed on a cycle; those are straightforward. Others have never been touched, and on those the honest question is whether there's still a base worth building on.

Osseo

We work the whole village rather than a named handful of neighborhoods.

Around Osseo: Buffalo River, Buffalo River State Trail, I-94 interchange.

Standard 48-inch frost depth. Osseo sits on unglaciated ground like Strum, so the subgrade is residual soil rather than the sorted outwash of the Chippewa valley.

From our jobs

Job Photos

A large freshly paved asphalt lot curving around a landscaped island in front of a low institutional building
A lot repaved, edge to edge
A freshly paved asphalt driveway running up to a three-bay garage, caution tape across the street end
A driveway repaved and taped off to cure

All job photos

Overlay or tear out and replace?

An overlay is new asphalt laid over the old surface. It's roughly half the cost of a replacement, it goes down in a day, and it's the right answer when the existing base is sound and the surface has simply worn out. It's the wrong answer when the base has failed, because an overlay follows the shape of what's underneath. Lay one over a surface that's cracked into squares and those cracks come through the new mat within two or three years, and the overlay only delayed the replacement. That conversation is worth having before the quote, not after.

What Decides the Price in Osseo

Asphalt tracks the oil market, so a number from last season is not a number for this one. Every job here is measured on site and the number is fixed before work starts.

Tear out and replace

Per square foot

Measured on site

  • Old surface out, base rebuilt, new mat laid and rolled

Gravel to asphalt

Per square foot

Measured on site

  • Common out in the townships, where drives are long
  • Grading and drainage are most of the work and most of the cost

The setup on a long rural drive is spread over more area than on a short town one. If you've been told a long drive is prohibitive, it's worth a second number.

How the Work Goes in Osseo

The base is the part you never see and the part that decides everything.

Work out where the water goes

Before anything else. Grade and drainage decide the lifespan, and they're the one thing that can't be fixed later without starting again.

Remove, or prepare what stays

Full replacement means the old surface comes out. An overlay means the existing surface is cleaned, failed areas cut out and patched, and the edges prepared.

Base, graded and compacted

Compacted in lifts to the right depth for what will drive on it. A driveway and a lot that takes delivery trucks need different bases, and building both the same way is how one of them fails early.

Lay and roll

Hot mix laid to the design thickness and rolled while it's hot. Compaction is time-limited, which is why paving is a day that runs to the weather.

Tell you when to seal it

Not this year. New asphalt needs six to twelve months to cure before its first seal, and sealing too early traps the oils and does more harm than leaving it alone.

Questions We Get in Osseo

What Osseo calls us about, answered straight.

More questions answered
Is Osseo far enough south that the drive costs us something?
No. It is about twenty-five minutes down I-94 and we are through here often enough that it is not a special trip. As anywhere at that distance, two or three drives on the same street in one visit costs each of you noticeably less than one on its own.
We're right off the interchange and our lot takes semi traffic. Is that different?
Yes, and Osseo has more of it than a village of 1,800 normally would, because US 10, US 53 and Interstate 94 all meet here. A lot taking loaded trucks fails in specific places rather than evenly: where they turn in, where they stop, and wherever a trailer's landing gear comes down. Those spots need full-depth repair or concrete, not sealer, and the rest of the lot is usually fine. Worth walking the truck route separately from the car parking when we look at it.
How much does a new asphalt driveway cost?
It comes down to three things: the square footage, whether the existing base can be built on or has to come out, and how much of the drive a truck can reach. An overlay over a sound base is the cheapest way to a new surface; a full tear out and replace is the most expensive and is sometimes the only thing that lasts. Asphalt also tracks the oil market, so a number from last season is not a number for this one. We measure it and price it, free either way.
Can I overlay the driveway instead of replacing it?
If the base is sound, yes, and it saves roughly half. If the surface is cracked into squares that flex underfoot, no: the base has failed and those cracks will come through a new overlay within a couple of years.
When can a new driveway be sealed?
Six to twelve months after paving. New asphalt needs to cure and release its lighter oils first, and sealing early traps them. Anyone offering to seal brand new asphalt is telling you something about how they work.
How long does a well-built driveway last?
Fifteen to twenty years if the base was done properly and it gets sealed every two to three years. Without sealing, closer to ten, because oxidation and water take it from the surface down.
Can you pave a gravel driveway?
Yes, and it's common out in the townships. The grading and drainage are most of the job, and the setup on a long drive is spread over more feet.
When can we drive on new asphalt?
Cars after about 24 hours once it has cooled properly, heavy vehicles after several days. In hot weather keep the wheels moving when you turn for the first few weeks, because fresh asphalt scuffs.

Get a Free Estimate in Osseo

Tell us what it looks like and we'll come measure it. You get a written price before anything starts.

(715) 450-9897
  • Free on driveways and lots anywhere in the service area
  • A photo of the problem helps, and it can go in the message
  • Surfaces that are not ready yet get told so at the estimate

Get an estimate

Send the form and we'll call you back. The estimate is free.